Login | Signup now       

Guest

 Click to see how  

HOME | VIDEOS | DOCUMENTS | COLLECTIONS | UPLOAD | BROADCAST | MY ACCOUNT | FEEDBACK | ABOUT

 

Share  Title: A report discussing critical factors affecting Project perfo...

 

 
Abstract

 Download Papers  Read full document

 
 
 
iConnect (Beta)   |   Sponsor  |   Comment   |    Report    Like    
 
 

Various researches have tried to determine the factors that are responsible for a successful project. The purpose of this paper is to explore the critical factors affecting project performance and develop a framework for measuring success of construction projects. In this paper, a set of key performance indicators (KPIs), namely planning and control, procurement, time, cost, quality and environmental performance are identified as crucial to project performance amongst many others. The importance and the limitations of the suggested KPIs are discussed. The validity of the proposed KPIs is also tested by three case studies. Recommended solutions targeting each area of concern from lessons learnt in the case studies provide a basis for improved project management for large scale projects. With the development of KPIs, a benchmark for measuring the performance of a construction project can be set.

 
 
Download Papers  Read full document
 
 
 
Most Viewed This Month
Supersonic Nozzle design by Method of Characteristics
A report discussing critical factors affecting Project performance
Rayleigh criteria and Combustion Instability
JPEG Progressive mode vs Sequential mode
Adaptive Equalization Techniques using Least Mean Square (LMS) algorithm
Combustion Instability in Liquid Rocket Engines
Adaptive Equalization Techniques using Recursive Least Square (RLS) algorithm
A Technical Essay on the Gyroplane
Girlkultur Mass Culture in Weimar Germany
Laminar Separation Bubble
Business Plan for Online Money Transfer
Experimental Study of Compressible Pipe Flow with Friction and Heat Addition
Blind De-convolution of BPSK and QPSK modulated signal using Constant Modulus Algorithm (CMA).
Coefficient of Thermal Expansion and Thermal Shock Parameter
Temperature measurements during Reentry
 
Related Documents
A report discussing critical factors affecting Project performance
Technical Report
Value Management
Complex Classification Using Advanced Machine Learning Techniques
Rayleigh criteria and Combustion Instability
Sustainable Energy Production and Utilization In Semi-rural Arizona
siRNA and gene silencing
Gender Classification Using Support Vector Machines (SVMs)
Modeling and Simulation of Mixing Layer Flows For Rocket Engine Film Cooling
Blind De-convolution of BPSK and QPSK modulated signal using Constant Modulus Algorithm (CMA).
Adaptive Equalization Techniques using Recursive Least Square (RLS) algorithm
Motor neuron disease
Combustion Instability in Liquid Rocket Engines
Adaptive Equalization Techniques using Least Mean Square (LMS) algorithm
Temperature measurements during Reentry
 
Member Documents
Metro Station Complex- A Public Realm
Japan Metal Building Systems
A report discussing critical factors affecting Project performance
Value Management
Integrated Approach to Value Management and Sustainable Construction in Indian Construction Industry
Technical Report
Portfolio
 

Keywords

Criteria  for  Project  Success  planning  procurement  
 
 
 About This Document
 
 Subject Architecture
 Category Assignment
 Views 6302
 Downloads 494
 Added 09-11-10
 Contributor   Arpita Ghosh
 Add to Favourites
 Report Abuse
 
 Related Videos
 See More

 RunTime  00:07:00
 Uploaded  26-12-07
 Views  2322
   
 Making a Gantt Chart in E...

 RunTime  moderate
 Uploaded  29-04-13
 Views  282
   
 Hydraulic Model of Cardio...

 RunTime  00:00:02
 Uploaded  20-10-07
 Views  2330
   
 Revit Building Tutorial

 RunTime  00:08:03
 Uploaded  30-12-07
 Views  2320
   
 Erin Peacock, MPH - Colle...

 RunTime  moderate
 Uploaded  15-09-10
 Views  2662
   
 NASA and Caltech Test Ste...

 RunTime  00:36:49
 Uploaded  30-12-07
 Views  2258
   
 An Interview with David P...

 RunTime  00:07:47
 Uploaded  28-11-07
 Views  2260
   
 Micro and nanotechnologie...

 RunTime  00:01:19
 Uploaded  25-06-10
 Views  2333
   
 SR 71 Blackbird

 RunTime  00:05:20
 Uploaded  02-04-10
 Views  3575
   
 Influence of a Streamwise...

 RunTime  00:00:02
 Uploaded  22-11-07
 Views  2602
   
 Kettering EE Capstone

 RunTime  00:03:30
 Uploaded  27-11-07
 Views  2324
   
 Translation

 RunTime  00:03:58
 Uploaded  27-11-07
 Views  2547
   
 Automatic report generati...

 RunTime  00:00:02
 Uploaded  18-10-07
 Views  2617
   
 Manipulating Animated Fun...

 RunTime  00:03:24
 Uploaded  27-12-07
 Views  2684
   
 Lockheed Morphing UAV

 RunTime  moderate
 Uploaded  27-01-12
 Views  446
   
 Mining 50 years of Chimpa...

 RunTime  00:09:58
 Uploaded  03-09-09
 Views  2411
   
 Standing Waves in Air Col...

 RunTime  00:10:00
 Uploaded  09-12-07
 Views  2258
   
 Phoenix Launch

 RunTime  moderate
 Uploaded  26-06-12
 Views  525
   
 Audible Frequency Range

 

 

Comments | Queries | Clarifications